Lines
Stage-by-stage synchronization and the constraint between stages.
Primary bottleneck · Stage 6 to 7
Stage 6 to 7: 140 kg queued. downstream capacity does not exceed inflow. Manual intervention needed.
- Queued
- 140kg
- Oldest lot
- 2.5h
- Breach in
- —
Why this is the constraint
- Changeover excess
- −912 kg · 100%
Palghar Unit III
Continuous Synchronized Stage Flow · 7 Sequential Processing Work-Centers
Dispensing & Kitting
Liquid Oral Line A
Liquid Oral Line A - Intake Unit
Liquid Line B
Liquid Line B - Intake Unit
Bottling Line 1
Bottling Line 1 - Intake Unit
Granulation / Mixing
Liquid Oral Line A
Liquid Oral Line A - Dispensing Unit
Liquid Line B
Liquid Line B - Dispensing Unit
Bottling Line 1
Bottling Line 1 - Dispensing Unit
Compression / Blending
Liquid Oral Line A
Liquid Oral Line A - Bulk Unit
Liquid Line B
Liquid Line B - Bulk Unit
Bottling Line 1
Bottling Line 1 - Bulk Unit
Primary Packaging / Blister
Liquid Oral Line A
Liquid Oral Line A - Primary Packaging Unit
Liquid Line B
Liquid Line B - Primary Packaging Unit
Bottling Line 1
Bottling Line 1 - Primary Packaging Unit
Secondary Packaging
Liquid Oral Line A
Liquid Oral Line A - Secondary Packaging Unit
Liquid Line B
Liquid Line B - Secondary Packaging Unit
Bottling Line 1
Bottling Line 1 - Secondary Packaging Unit
QC and Release
Liquid Oral Line A
Liquid Oral Line A - QC and Release Unit
Liquid Line B
Liquid Line B - QC and Release Unit
Bottling Line 1
Bottling Line 1 - QC and Release Unit
Dispatch
Liquid Oral Line A
Liquid Oral Line A - Dispatch Unit
Liquid Line B
Liquid Line B - Dispatch Unit
Bottling Line 1
Bottling Line 1 - Dispatch Unit