Lines
Stage-by-stage synchronization and the constraint between stages.
Primary bottleneck · Stage 6 to 7
Stage 6 to 7: 140 kg queued. downstream capacity does not exceed inflow. Manual intervention needed.
- Queued
- 140kg
- Oldest lot
- 2.5h
- Breach in
- —
Why this is the constraint
- Rate / speed loss
- −3,679 kg · 100%
Palghar Unit II
Continuous Synchronized Stage Flow · 7 Sequential Processing Work-Centers
Dispensing & Kitting
Cosmetic Tube Line
Cosmetic Tube Line - Intake Unit
Aerosol Line 1
Aerosol Line 1 - Intake Unit
Granulation / Mixing
Cosmetic Tube Line
Cosmetic Tube Line - Dispensing Unit
Aerosol Line 1
Aerosol Line 1 - Dispensing Unit
Compression / Blending
Cosmetic Tube Line
Cosmetic Tube Line - Bulk Unit
Aerosol Line 1
Aerosol Line 1 - Bulk Unit
Primary Packaging / Blister
Cosmetic Tube Line
Cosmetic Tube Line - Primary Packaging Unit
Aerosol Line 1
Aerosol Line 1 - Primary Packaging Unit
Secondary Packaging
Cosmetic Tube Line
Cosmetic Tube Line - Secondary Packaging Unit
Aerosol Line 1
Aerosol Line 1 - Secondary Packaging Unit
QC and Release
Cosmetic Tube Line
Cosmetic Tube Line - QC and Release Unit
Aerosol Line 1
Aerosol Line 1 - QC and Release Unit
Dispatch
Cosmetic Tube Line
Cosmetic Tube Line - Dispatch Unit
Aerosol Line 1
Aerosol Line 1 - Dispatch Unit