Skip to content

Synthetic demo data. Details

Floor Command

The plant's operating picture, read in under ten seconds.

Constraint

Top client Aarav Pharmaceuticals at day 35 (contract cadence 28 days)

WIP queued
420kg
Oldest lot age
9.5h
Bottleneck attainment
70%
Plan AttainmentLiveDerived
99.8%
4.8 vs planTarget 95%ok
Line UtilizationLiveDerived
86.8%
1.8 vs targetTarget 85%ok
WIP (bulk to pack)LiveReported
95kg
105 vs limitLimit 200 kgok
Details
95 kg in 4 drums. Oldest item: 2.5 hours in queue.
Avg ChangeoverLiveReported
55min
25 vs targetTarget 30 mincritical
Details
Worst pair: Aarav to Bharat (Foil)
Labor ProductivityLiveDerived
102.4%
2.4 vs targetTarget 100%ok
Release TurnaroundLiveReported
31.2h
7.2 vs targetTarget 24 hcritical
Details
Quarantine value: ₹12.0 L

Revenue run-rate at 95.8%, cash conversion cycle at 77.8 days (target 46.2 days)

Monthly Revenue Run-Rate
95.8%of budget
Top 10 Client Share
49%concentration
Reorder Radar Exposure
₹45.0 L(1 account)

Aarav past 28-day cadence

Cash Conversion Cycle
77.8dayscritical

+31.6 days above 46.2d benchmark

Working capital at 77.8 days (+31.6 drag). Top account reorder at day 35.

Ranked floor blockers and recommended interventions

Owner: plant-headReview action
2 key operators within 2 h of weekly overtime ceiling

10.5 h and 10.2 h accrued against 12 h limit

watch
Owner: line-supervisorReview action
Foil format changeovers +25 min over target (Shift C worst)

+25 min avg overage across 28 changeovers

watch
Owner: line-supervisorReview action
Owner: plant-headReview action

7-stage synchronization, buffer levels, and inter-stage queue ages

Stage 1INTAKE

Raw Intake & Sampling

98%/ 100%
65 kg2 drums1.4h
Stage 2DISPENSE

Dispensing & Kitting

95%/ 100%
80 kg3 drums2.1h
Stage 3BULK

Compression & Granulation

96%/ 100%
420 kg14 drums9.5h
Stage 4PACK-1

Blister & Strip Packaging

70%/ 100%
75 kg3 drums1.8h
Stage 5PACK-2

Cartoning & Shipper Pack

92%/ 100%
50 kg2 drums1.1h
Stage 6QC-REL

Quality Release & Quarantine

88%/ 100%
35 kg1 drums0.9h
Stage 7DISPATCH

Finished Goods Dispatch

94%/ 100%
Stage 3 to 4 buffer growth (last 6 shifts)Threshold: 200 kg

Trend of 6 points, from 80 to 420 kg, ending at 420 kg (Current).

Compression at 96% vs blister at 70%. Stage 3–4 queue holds 420 kg (14 drums), oldest 9.5 h.

Turnaround 31.2 h vs 24 h target (₹12.0 L held in quarantine)

Lab Release Turnaround

31.2 hours avg

Quarantine Impact

₹12.0 L

critical
CategoryMonTueWedThuFriSatSun
Microbiology34.0h22.5h22.5h22.5h22.5h22.5h22.5h
Analytical Chem18.0h18.0h18.0h18.0h18.0h18.0h18.0h
Packaging QC12.0h12.0h12.0h12.0h12.0h12.0h12.0h

Microbiology turnaround averages 31.2 h vs 24 h target, with Monday cohorts delaying batch release and ₹12.0 L held in quarantine.

Shift output compared against rated shift plans across lines

Pet-food Extrusion Line

Palghar Tablet Unit

94%(-6%)watch
Tablet Compression Line 1

Palghar Tablet Unit

96%(-4%)ok

Avg 55 min vs 30 min target

Worst pair: Aarav to Bharat (Foil) (61 min)Details

Labor productivity index and active cohort headcounts

Solid Dose Operators

24 active operators

104%ok

Blister Packaging Crew

18 active operators

88%watch

Liquid & Sterile Ops

16 active operators

98%ok

Quality Analysts

12 active operators

92%watch

Maintenance Crew

10 active operators

100%ok

Blister Packaging Crew productivity index at 88% (-12 pts vs 100% baseline).

Shift hygiene check-ins, overtime boundaries, and training certifications

Weekly Overtime: 2 operators within 2 h of ceiling (Rajesh Sharma (1.5h left), Amit Patel (1.8h left))
watch
Shift Hygiene Check-In: 98.5%
ok
SOP Training Currency: 96%
ok

Every line. Every shift. One clear picture.

Seeded demo data